Enact will create your own customized account and will provide you with access to this. You will receive an email with your username and password. Here is the link to access this to create new sites and view your fleet.
In order to create new sites, you need to follow the steps based on the specific supported inverter type used. For example, inverters such as Tesla, SMA & Enphase require Authorization from the customer directly via email while others such as SolarEdge & Sol-Ark require an API key. Your Enact CS Manager will assist you with instructions based on the inverter types you use.
Below are the fields needed to create a site in Enact:
| Required | Optional |
|---|---|
| System Name | Phone Number |
| System Type (Residential or Commercial) | Module Manufacturer, Model, Quantity |
| Site Address (Street, City, State, Zip Code) | Battery Manufacturer, Model, Quantity |
| System Cost | |
| System Size | Racking Type |
| PTO Date | |
| Pre/Post Utility (or can use default) | |
| Pre/Post Utility Rate (or can use default) | |
| System Cost | |
| Inverter/Microinverter Manufacturer, Model, Quantity | |
| AC/DC Coupled | |
| Consumption Meter Installed? | |
| System ID (depending on inverter) |
You may be responsible for managing and paying for API data plan, depending on OEM connecter type. Your Enact CS contact will provide more information if applicable.
Once you have all of the information you need, follow the below steps: